School-Wide Environmental Changes
HVAC System
|
In the summer of 2020 a new energy efficient HVAC system was installed replacing the old system. Filters are replaced 4 times per year following health standards.
Click here for system specifications. |
PAC
|
In 2018, the Parish Activities Center was completed. This energy efficient new structure includes a full-size gymnasium and gathering space. Sensor activated lights, toilets and sinks were included in the new space. New green spaces surround the building. |
|
Educational Trails
|
Two educational trails were cleared on the 17 acres of land adjacent to the current property acquired in 2016. The property includes forest, water, and bog areas. The first trail was completed in 2018 with the help of the Maryland Conservation Corps and parent volunteers. It includes signage and 2 separate gathering areas for instruction. The second trail was completed by Trail Conservancy, Inc. was completed in 2021.
|